Installation Guide
Back-up Battery
The optional back-up battery is pre-assembled
under the monitor stand at delivery.
Let the machine stay with the ACDC-unit in
power on mode over night in order to charge
the batteries.
Replacement of the lead acid batteries must be
done according to following electrical diagram.
Both lead acid batteries must be changed at the
same time and only batteries approved or
supplied by Gambro Lundia AB may be used.
Changed batteries must be recycled or disposed
of properly.
Fuse: T15 A
Running time: 30 minutes
The charge indicator on the power supply is lit
when the AK 95 S is equipped with the back-up
battery. The machine must be connected to
mains voltage and the mains switch must be on.
In a mains failure situation following attention
will be given.
POWER FAILURE, BATTERY OPERATION
Battery operated for x minutes
Before the battery is empty following attention
will be given.
LOW BATTERY POWER
Machine turnes off in one minute
1:8
AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004