Gambro AK 95 S Service Manual page 70

Dialysis machines
Table of Contents

Advertisement

Auto Heat disinfection:
AK 95
Disinfection
programs
Heat
With UFD
installed
Heat
CleanCart
Heat
Without UFD
Heat
CleanCart
Temperature:
Note:
Rinse/Drain :
Rinse/Drain
Drain
Exterior cleaning:
Note ! Total Time for Disinfection Programs are estimated and may vary.
Power supply
Mains voltage:
Note:
Power consumption:
Cable length:
Cable area:
External fuses:
AK 95 HCEN9135 Rev. 10.2005
One of two alternatives for auto heat disinfection can be
selected.
Total Time [min]
110 V
230 V
31
43
31
43
+93°C (measured after heating rod)
≥80°C (measured in the outlet before the heat exchanger )
The temperatures are verified at nominal values for the mains
voltage and at 20°C ambient temperature.
10 minutes
4 minutes
All outside parts of the machine can be cleaned with ethanol
(70%) or isopropanol (60%).
100 V(at 50 Hz or 60 Hz) , 110 V(at 50 Hz or 60 Hz) or
230 V(at 50 Hz or 60 Hz) (∼,AC), (±12%). The voltage
has to be specified before installation.
The user must verify the quality of the protective earth in the
installation.
2025W at 230V
1575W at 110V
1275W at 100V
3 m
AWG 16 at 100V and 110V
1 mm
at 230V
2
For 100/110 V, 2 x 10AT for heater and 2 fuses specified by
Philips (se AC/DC unit K15740 008) For 230V, 2 x 10AT
for heater and 2 fuses specified by Philips (se AC/DC unit
K15740 007)
100 V
35
45
49
58
35
45
48
58
Technical Data
3:7

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Gambro AK 95 S

This manual is also suitable for:

Ak 95

Table of Contents