Gambro AK 95 S Service Manual page 84

Dialysis machines
Table of Contents

Advertisement

Presetable parameters in Autopriming
0
Auto priming install
1
Auto priming fill flow
This is the initial flow rate when
filling the dialyzer and blood lines.
2
Auto priming fill time
This is the time for filling the dialyzer
and blood lines completely.
3
Auto priming press build time
The venous clamp closes. This is the time for
building up the venous pressure alarm limit.
4
Auto priming press drop time
The measurement time for the pressure
drop when performing the leakage test
of the dialyzer.
5
Auto priming press drop
The acceptable pressure drop when per-
forming the leakage test of the dialyzer.
6
Auto priming prim flow
This is the flow rate during the priming
phase as well as during the flushing phases.
7
Auto priming prim time
This is the required time for the priming
phase.
8
Auto priming cycle time
This time specifies the opening and closing
time of the venous clamp during the priming
phase.
9
Auto priming level time
This is the time necessary to fill up the
venous drip chamber to a correct level.
10 Auto priming flush time 1
During this time, the remaining air in
the dialyzer and blood lines will be expelled.
1 1
Auto priming flush time 2
If a second flush is requested, select this time.
12 Auto priming venous line time
The time when the venous clamp is open.
In order to expell any air bubbles in the
venous line.
13 Auto priming FM active
AK 95 / AK 95 S Service Manual
HCEN 9136 Rev. 10.2005
Service Technicians Guide
Installed / Not installed
0 - 500 ml/min
0 - 300 s
0 - 30 s
0 - 60 s
0 - 100 mmHg
0 - 500 ml/min
0 - 600 s
0 - 60 s
0 - 60 s
0 - 300 s
0 - 600 s
0 - 120 s
Avail / Not Avail
4:11

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Gambro AK 95 S

This manual is also suitable for:

Ak 95

Table of Contents