Timing Of Screen Changeover - Mitsubishi Electric F930GOT-BWD-E User Manual

Graphic operation terminal
Hide thumbs Also See for F930GOT-BWD-E:
Table of Contents

Advertisement

Graphic Operation Terminal F930GOT
10.2.3

Timing of screen changeover

Inside the GOT, whether or not the screen changeover condition specified by the "Change
Screen" object is satisfied, it is checked in the order of the common setting for all screens and
the setting for individual screens. When the specified condition is satisfied, the next screen is
displayed.
Common setting
for all screens
Setting for
individual screen
• For example, even if the screen changeover condition for individual screen is satisfied at the
point A earlier than satisfaction of the screen changeover condition for all screens at the
point B, the priority is given to the common setting for all screens and the screen specified
by the common setting for all screens is displayed.
If two or more screen changeover conditions are satisfied at the same time, the screen is
changed over in accordance with the setting of an object with highest priority.
*3 When screen changeover is performed, the "Change Screen" object for the previous indi-
vidual screen is replaced with the "Change Screen" object for the new individual screen.
• Screen changeover is performed in accordance with the priority as described above.
If the screen changeover condition is equivalent, the object registered later is ignored.
1
The priority is given in
the order of registration.
50
1
The priority is given in
the order of registration.
50
Changeover of Display Screen (FX-PCS-DU/WIN-E) 10
Internal processing
"screen changeover"
A
B
*1
10-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents