Mitsubishi Electric F930GOT-BWD-E User Manual page 112

Graphic operation terminal
Hide thumbs Also See for F930GOT-BWD-E:
Table of Contents

Advertisement

Graphic Operation Terminal F930GOT
• Example of screen overlay
Screen overlay: Each process is monitored. When a material has run short, the material
Program in PLC
Screen changeover
Word devices: Word devices to specify screen Nos. to overlay/be overlaid
Base screen
Overlap window 1
Overlap window 2
Line selector switch
X0
Sensor
M10
X2
C0
X4
T0
M20
T0
In the program above, the line 1 is selected. Even if the line 2 is selected, screens can be over-
laid in the same way.
name is displayed on the screen, and a message is displayed to notify
necessity of supplement of the material.
- Line selector switch
Line 1 input: X0
Line 2 input: X1
- Sensor (for bolt count)
Line 1 input: X2
Line 2 input: X3
- Supplement confirmation button: X4
D0
Set them in "Change Screen" in "Common Setting" in the
D1
SW¨D5C-GOTRE-PACK.
D2
MOV
K2
P
MOV
K0
P
MOV
K0
P
M20
Supplement is
completed.
MOV
K2
P
MOV
K10
P
MOV
K20
P
RST
C0
M20
MOV
K2
P
MOV
K11
P
MOV
P
K0
MOV
K0
P
M10
Selects the line 1.
Displays the screen No. 2.
D0
D1
Stores "0" in control devices indicating
screens not to be overlaid.
D2
C0
Counts the number of bolts.
K1000
Base screen to be overlaid
D0
D1
Specify the screens to be overlaid.
Screen No. 10 → D1
Screen No. 20 → D2
D2
Resets the counter by X4 when
supplement is completed.
T0
Displays the message No. 11 (which
notifies that supplement of material is
completed) for ¡ seconds.
Base screen to be overlaid
D0
Specify the screens to be overlaid.
D1
(Screen No. 11 → D1)
Screens overlay is not performed.
D2
Screen overlay is finished.
D1
Stores "0" in control device.
Creation of Display Screens 8
Display a)
in the
next page
Display b)
in the
next page
Display c)
in the
next page
Display a)
in the
next page
8-22