Subaru IMPREZA 2002 Service Manual page 32

Hide thumbs Also See for IMPREZA 2002:
Table of Contents

Advertisement

AT SHIFT LOCK SOLENOID AND "P" POSITION SWITCH
I
CONTROL SYSTEMS
C: INSPECTION
Is the shift lock solenoid oper-
ating properly?
Is the resistance less than 1
n?
Is the resistance more than 1
MR?
Step
1
CHECK SHIFT LOCK SOLENOID.
Measure the resistance of shift lock solenoid
connector terminals.
Terminal
NO. 4
-
NO.
5
2
CHECK SHIFT LOCK SOLENOID.
Connect the battery with shift lock solenoid
connector terminal, operate solenoid.
Terminal
NO. 4 (+)
-
NO.
5
(-)
3
CHECK "P" POSITION SWITCH.
1)Move the select lever to
" P
position.
2)Measure resistance between " P position
switch connector terminals.
1)Move the select lever to other than "P" posi-
tion.
2)Measure resistance between "P" position
switch connector terminals.
4
CHECK "P" POSITION SWITCH.
Go to step
3.
Replace the shift
lock solenoid and
" P position switch
assembly.
Replace the " P
position switch.
Go to step 4.
Normal
Replace the "P"
position switch.
Check
and 20 R?
lock solenoid and
" P position switch
assembly.
CS-30

Advertisement

Table of Contents
loading

Table of Contents