Start Program For High-Level Positioning Control; Starting High-Level Positioning Control - Mitsubishi Electric QD75P1N User Manual

Type qd75p/qd75d positioning module
Table of Contents

Advertisement

10 HIGH-LEVEL POSITIONING CONTROL

10.6 Start program for high-level positioning control

10.6.1 Starting high-level positioning control

CPU module
1) Set "7000" in " Cd. 3 Positioning start No.".
(This establishes that the control as "high-level positioning control" using block start data.)
2) Set the point No. of the "block start data" to be started. (In this case "1".)
3) Turn ON the start signal.
4) The positioning data set in the "1st point block start data" is started.
To execute high-level positioning control, a sequence program must be created to start
the control in the same method as for major positioning control.
The following shows the procedure for starting the "1st point block start data"
(regarded as block No. 7000) set in axis 1.
Buffer memory
1)
7000
1500
2)
1
1501
3)
ON
Input/output signal
Y10
Fig. 10.2 High-level positioning control start procedure
QD75
4)
Control by designated
positioning data
When carrying out a positioning start with the
next scan after a positioning operation is
completed, input signal X10 as an interlock so
that the start is carried out once the X10 signal
turns OFF after the Y10 signal turns OFF.
10 - 24
MELSEC-Q
Drive unit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents