Mitsubishi Electric QD75P1N User Manual page 532

Type qd75p/qd75d positioning module
Table of Contents

Advertisement

12
CONTROL SUB FUNCTIONS
12.2.2 OP shift function
Pr. 46 OPR speed
Machine OPR start
When a machine OPR is carried out, the OP is normally established using the near-
point dog, stopper, and zero signal. However, by using the OP shift function, the
machine can be moved a designated movement amount from the position where the
zero signal was detected. A mechanically established OP can then be interpreted at
that point.
The OP shift function can be used without relation to " Pr.43 OPR method".
The details shown below explain about the "OP shift function".
[1] Control details
[2] Setting range for the OP shift amount
[3] Movement speed during OP shift
[4] Control Precautions
[5] Setting method
[1]
Control details
The following drawing shows the operation of the OP shift function.
Pr. 44 OPR direction
Near-point dog
Zero signal
Fig. 12.4 OP shift operation
Shift operation carried out after
the deviation counter clear and reset.
12 - 8
MELSEC-Q
Speed selected by the " Pr. 56
Speed designation during OP
shift"
Pr.47 Creep speed
Pr.53 OP shift amount

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents