High-Level Positioning Control Execution Procedure - Mitsubishi Electric QD75P1N User Manual

Type qd75p/qd75d positioning module
Table of Contents

Advertisement

10
HIGH-LEVEL POSITIONING CONTROL
MELSEC-Q

10.2 High-level positioning control execution procedure

High-level positioning control is carried out using the following procedure.
REMARK
(1) Five sets of "block start data (50 points)" and "condition data (10 items)
corresponding to "7000" to "7004" are set with a sequence program.
(2) Five sets of data from "7000" to "7004" can be set when GX Configurator-QP
is used. If GX Configurator-QP is used to set the "block start data" and
"condition data" corresponding to "7000" to "7004" and write the data to the
QD75, "7000" to "7004" can be set in " Cd.3 Positioning start No." in STEP
4.
10 - 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents