4.5 Precautions

Station No. settings of the PLC side
In the system configuration, the PLC with the station
number set with the host address must be included.
For details of host address setting, refer to the
following.
■ Communication detail settings
System configuration of the PLC side
GOT can communicate in a system configuration where
NC1L-PS4, FFU120B and FFK120A-C10 are mixed.
When using FFK120A-C10, the number of PLCs that
can communicate is at most 6 units.
GOT clock control
The GOT clock function is available only for the PLC
with the station number set with the host address.
For details of host address setting, refer to the
following.
■ Communication detail settings
4. CONNECTION TO FUJI PLC
4.5 Precautions
1
2
3
4
5
6
7
8
4 - 31