Mitsubishi Electric GOT1000 Series Connection Manual page 74

Graphic operation terminal
Hide thumbs Also See for GOT1000 Series:
Table of Contents

Advertisement

Confirming the communication state on the GOT (For GT16, GT14)
[PING Test] can be confirmed by the Utility screen of the GOT.
For details on the operation method of the GOT Utility screen, refer to the following manual.
1 - 44
1. PREPARATORY PROCEDURES FOR MONITORING
1.6 Checking for Normal Monitoring
GT16 User's Manual (Basic Utility)
GT14 User's Manual

Advertisement

Table of Contents
loading

Table of Contents