14.2.7 Connecting to SIMATIC S7-
200
Communication settings
Set the communication settings of PLC and PC/PPI
cable.
(1) PLC settings
Set the communication settings of PLC by operating
the SIEMENS programming tool(STEP7-WIN32).
Setting item
*1
Transmission speed
Data bit
Parity bit
Stop bit
*2
Host address
*1
Adjust the settings with GOT settings.
*2
Set the address without overlapping the address of other
units.
(2) PC/PPI cable settings
Set the transmission speed by operating the DIP switch
on the PC/PPI cable.
DIP switch
(down side:0, upper side:1)
1
0
1
0
1 2 3 4 5
SWITCH 123
SWITCH 4
SWITCH 5
SWITCH
SWITCH
SWITCH
1
2
3
0
0
1
0
1
0
*1
Adjust with GOT settings.
14 - 8
14. CONNECTION TO SIEMENS PLC
14.2 Serial Connection
PLC Side Setting
9600bps, 19200bps
8bits (fixed)
Even (fixed)
1bit (fixed)
1 to 31
RS-232
PC/PPI cable
RS-485
S7-200 CPU
SWITCH
SWITCH
Transmission
4
5
speed
*1
0
0
19200bps
*1
0
0
9600bps

14.2.8 Precautions

GOT alarm list (system alarm) function
Error information cannot be monitored when the GOT is
connected to a SIEMENS PLC.
(The error information on the PLC CPU side can be
monitored.)
For details on the alarm list (system alarm), refer to the
following manual:
GT Designer3 Version1 Screen Design Manual
At system startup
(1) When powering ON the system
Turn ON all PLC CPUs before turning ON the GOT.
If the GOT is turned ON before power-up of the PLC
CPUs, restart the GOT.
(2) When powering OFF a PLC CPU at another station
When a PLC CPU at another station (the PLC CPU to
which the HMI Adapter is not connected) is turned OFF,
monitoring by the GOT is stopped.
To resume the monitoring, restart the GOT.
(Monitoring will not be resumed on GOT even if the
PLC CPU is turned ON again.)