Installing The Micro Base Station Equipment - Alvarion BreezeMAX 3500 System Manual

Hide thumbs Also See for BreezeMAX 3500:
Table of Contents

Advertisement

Chapter 2 - Installation
2.3
In
stalling the Micro Base Station
Eq
uipment
2.3.1
In
stallation Requirements
2.3.1.1
Packing List
Micro Bas
Mains power cable or a DC power cable
Monitor cab
2.3.1.2
Additional Installation Requirements
Ethernet
A grounding cable with appropriate terminations for connecting the unit's
ground terminal to the rack or to a ground connection.
Mains plug adapter or termination plug (if the power plug on the supplied AC
power cord does not fit local power outlets).
For installation in a 21" ETSI rack: two 21" ETSI rack adapters
A portable PC for configuring parameters using the Monitor cable.
Other installation tools and materials
60
e Station Unit
le
cable (straight) for connecting the unit to a hub/switch.
BreezeMAX System Manual

Advertisement

Table of Contents
loading

Table of Contents