Installing The Odu - Alvarion BreezeMAX 3500 System Manual

Hide thumbs Also See for BreezeMAX 3500:
Table of Contents

Advertisement

Chapter 2 - Installation
2.1

Installing the ODU

The following sections describe how to install the outdoor units of the CPE
(S
U-ODU) and of the Base Station equipment (the AU-ODU is the outdoor unit of
each AU-I
including pole mounting the ODU, and connecting the cables.
2.1.1
ODU Installation
2.1.1.1
AU-ODU Packing List
ODU:
BMAX-BST-AU-ODU-3.5a, AU-ODU operating in the 3.5a band
OR
BMAX-BST-AU-ODU-3.5b, AU-ODU operating in the 3.5b band
Pole mounting kit
2.1.1.2
SU-ODU Packing List
OD
U:
BMAX-CPE-ODU-AV-3.5, a CPE ODU with an integral vertically polarized
antenna
OR
BMAX-CPE-ODU-AH-3.5, a CPE ODU with an integral horizontally
polarized antenna
OR
BMAX-CPE-ODU-E-3.5, a CPE ODU with a connector to an external
antenna (not included)
Pole mounting kit
32
DU in the modular Base Station and of the Micro Base Station),
Requirements
BreezeMAX System Manual

Advertisement

Table of Contents
loading

Table of Contents