Installing The Modular Base Station Equipment - Alvarion BreezeMAX 3500 System Manual

Hide thumbs Also See for BreezeMAX 3500:
Table of Contents

Advertisement

2.2
Installing the Modular Base Station
Equipment
2.2.1
BST Installation Requirements
2.2.1.1
Packing List
Base Station
BMAX-B
B
Cabl
2.5 meter DC cable
BMAX-BST-PIU (1 or 2 per chassis) Power Interface Unit(s)
2.5 met
chassis)
BMAX-BST-PSU (up to 4 per chassis) Power Supply Unit(s)
BMAX-BST-NP
BMAX-BST-AU-IDU (up to 6 per chassis) Access Unit Indoor Unit(s)
2.2.1.2
Additional Installation Requirements
The following items are also required to install the BST:
Ethernet cable (straight) for connecting the NPU to a Hub/Switch.
NOTE
The maximum length of the Ethernet cable is 100m when operating at 100 Mbps and 70m when
operating at 1 Gbps.
A grounding cable with appropriate terminations for connecting the chassis to
the rack or another ground (earth) connection.
For installation in a 21" ETSI rack: Two 21" ETSI rack adapters
BreezeMAX System Manual
Chassis:
ST-SH Base Station
MAX-B
ST-AVU Air Ventilation Unit (installed)
es Tr
ay kit
er DC cable (for a redundant PIU. One cable is supplied with each
U Network Processing Unit and Monitor cable

Installing the Modular Base Station Equipment

Chassis
43

Advertisement

Table of Contents
loading

Table of Contents