Alvarion BreezeMAX 3500 System Manual page 88

Hide thumbs Also See for BreezeMAX 3500:
Table of Contents

Advertisement

Chapter 2 - Installation
Connect the IDU-ODU cable to the RADIO connector. The RADIO conne
2
the CPE-IDU-1D is located on the front panel as shown in Figure 2-13.
CAUTION
Do not connect the data equipment to the RADIO port. The RADIO port supplies DC power to the
ODU, and this may harm other equipment connected to it.
Connect the power cord to the unit's AC socket, located on the rear panel.
3
Connect the other end of the power cord to the AC mains after verifying that
the unit is rated for the voltage in the country of use; the AC range is
indicated on the back side of the CPE-IDU-1D
NOTE
The color codes of the power cable are as follows:
Brown
Blue
Yellow/Green
Verify that the POWER LED located on the front panel is lit, indicating that
4
the unit is supplying power to the radio port.
Configure the basi
5
a
pplicable sec
C
onnect the 10/10
6
The cable connection should
hub/
I
nterface C
NOTE
The length of the Ethernet cable connecting CPE-IDU-1D to the user's equipment, together with the
length of the IDU-ODU cable, should not exceed 100 meters.
Verify proper operation as described in the applicable section of
7
Commissioning.
68
Phase
~
Neutral
0
Ground
c parameters and align the
tions of
Chapt
0 Base-T
switch and a straig
ht cabl
ard (NIC).
.
antenna as described in the
er 3 – Commis
sioning
ETHERNET connector(s) to t
be a crossed Ethernet if con
e if connecting directly to a PC Network
.
he data equipment.
necting to a
Chapter 3 –
BreezeMAX System Manual
ctor in

Advertisement

Table of Contents
loading

Table of Contents