Installing The Micro Base Station Equipment - Alvarion BreezeMAX 3500 System Manual

Hide thumbs Also See for BreezeMAX 3500:
Table of Contents

Advertisement

Installing the Micro Base Station
Equipment
Installation Requirements
Packing List
Micro Base Station Unit
Mains power cable or a DC power cable
Monitor cable
Additional Installation Requirements
Ethernet cable (straight) for connecting the unit to a Hub/Switch.
A grounding cable with appropriate terminations for connecting the
unit's ground terminal to the rack or to a ground connection.
Mains plug adapter or termination plug (if the power plug on the
supplied AC power cord does not fit local power outlets).
For installation in a 21" ETSI rack: Two 21" ETSI rack adaptors
A portable PC for configuring parameters using the Monitor cable.
Other installation tools and materials
Manual Revision 1.0

Installing the Micro Base Station Equipment

2-31

Advertisement

Table of Contents
loading

Table of Contents