Name
ETHER
NET (4)
(on the side
panel)
RADIO
(on the front panel)
POWER
(on the
bottom panel)
Name
POWER (3)
ETH (2)
WIRELESS (1)
2.4.3
SU-IDU Installation
To install the SU-IDU:
It is assumed that the IDU-ODU cable is already connected to the ODU (refer
1
to to
connector with a protective cover on the indoor end of the IDU-ODU cable.
Refer to
BreezeMAX System Manual
Table 2-19: CPE-IDU-1D Connectors
Connector
10/100Base-T (RJ-45)
with 2 embedded LEDs.
10/100Base-T (RJ-45)
3-pin AC
Table 2-20: CPE-IDU-1D LEDs
Description
Power Indication
Ethernet link status
(Ethernet integrity)
Wireless link status
Connecting the SU's IDU-ODU Cable
Appendix A
for instructions on preparing the cable.
Installing the CPE-IDU-1D Indoor Unit
Functionality
Connection to the user's LAN/PC
Cable connection to a
hub/switch/router: Crossed
Cable conne
ction to a PC: Straight
Connection to the ODU
Mains power connection
Functionality
Off – IDU is not powered or power failed
Green – IDU power is OK
Off – No Ethernet connectivity has been
detected between the outdoor unit and the
device connected to the indoor unit.
Green – Ethernet connectivity has been
detected between the outdoor unit and the
device connected to the indoor unit.
Off – SU is not associated with an AU/µBST
Green – SU is connected with an AU/µBST
on page 42). Assemble an RJ-45
67