Installing The Odu Of The Cpe; Cpe Installation Requirements - Alvarion BreezeMAX PRO 5000 CPE Product Manual

Cpe subscriber units
Table of Contents

Advertisement

Chapter 2 - Installation
2.1

Installing the ODU of the CPE

The following sections describe how to install the outdoor unit (ODU) of the PRO
CPE. CPE operation is exclusive for point to point and requires professional
installation.
CAUTION
ONLY experienced installation professionals who are familiar with local building and safety codes
and, wherever applicable, are licensed by the appropriate government regulatory authorities should
install outdoor units and antennas.
Failure to do so may void the product warranty and may expose the end user or Service Provider to
legal and financial liabilities. Alvarion and its resellers or distributors are not liable for injury, damage
or regulation violations associated with the installation of Outdoor Units or antennas.
2.1.1

CPE Installation Requirements

2.1.1.1
Packing List
The PRO CPE includes the following components:
ODU Package:
»
»
»
»
IDU Package:
»
Power Cable Package:
»
BreezeMAX PRO 5000 CPE
CPE ODU unit of chosen model
Mounting kit
Quick Installation Guide
Optional software utilities and User Guide CD
CPE IDU unit, comprising of AC power adapter and internal gateway
AC/DC power cable
12
Installing the ODU of the CPE
Product Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents