Installing the Modular Base Station
Equipment
Installation Requirements
Packing List
Base Station Chassis:
BMAX-BST-SH Base Station Chassis
BMAX-BST-AVU Air Ventilation Unit (installed)
Cables Tray kit
2.5 meter DC cable
BMAX-BST-PIU (1 or 2 per chassis) Power Interface Unit(s).
2.5 meter DC cable (for a redundant PIU. One cable is supplied with
each chassis))
BMAX-BST-PSU (up to 4 per chassis) Power Supply Unit(s)
BMAX-BST-NPU Network Processing Unit and Monitor cable.
BMAX-BST-AU-IDU (up to 6 per chassis) Access Unit Indoor Unit(s)
Additional Installation Requirements
Ethernet cable (straight) for connecting the NPU to a Hub/Switch.
NOTE
The maximum length of the Ethernet cable is 100m when operating at 100Mbps and
70m when operating at 1Gbps.
A grounding cable with appropriate terminations for connecting the
chassis to the rack or another ground (earth) connection.
For installation in a 21" ETSI rack: Two 21" ETSI rack adaptors
A portable PC for configuring parameters using the Monitor cable
(supplied with the NPU).
Other installation tools and materials
Manual Revision 1.0