4. Lift the door off the lower hinge pin and set the door aside.
Note – If you removed the rear door to complete another task, return to that task.
Otherwise, continue to the next step.
5. Continue to one of the following procedures based on whether you will be
routing the SP cables down through the floor or up to cable trays above the
server:
Related Information
"Move the Server to the Installation Site" on page 79
"Install the Door" on page 115

▼ Route the SP Cables Down

When routing the SP cables down through the floor, you must route them through
the front kick plate.
102
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
"Route the SP Cables Down" on page 102
"Route the SP Cables Up" on page 107