Oracle sparc M5-32 Installation Manual page 130

Table of Contents

Advertisement

Note – The SP serial and network cables can also be routed up through the top of the
server or down through the server floor. See
instructions.
FIGURE:
Figure Legend
1
2
3
Related Information
"Maximum Cable Connections" on page 121
"Cable Management Devices" on page 122
"Managing Data Cables" on page 136
120
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
Cable Routing Options
Data cables and power cords routed up
Data cables and power cords routed down
Data cables routed upward and power cords routed down
"Securing the SP Cables" on page 99
for

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents