Oracle sparc M5-32 Installation Manual page 120

Table of Contents

Advertisement

4. Route the two left SP cables up the left channel and out of the top of the server
through a notch to the left of the upper door hinge.
There is a small notch to the left of the upper door hinge that enables the cables to
exit the server. The left trim panel will secure the left SP cables to the left channel.
Note – Route the SP cables to the left of the screw stand-offs.
110
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents