Switch On The Facility Circuit Breakers - Oracle sparc M5-32 Installation Manual

Table of Contents

Advertisement

2. Connect terminals or a terminal emulators (PC or workstation) to the two serial
connections.
Configure the terminal or terminal emulator with these settings:
9600 baud
8 bits
No parity
1 stop bit
No handshake
Note – A null modem configuration is needed, meaning the transmit and receive
signals are reversed (crossed-over) for DTE to DTE communications. You can use the
supplied RJ-45 crossover adapters with a standard RJ-45 cable to achieve the null
modem configuration.
3. Press the Enter or Return key on the terminal devices connected to the SPs.
This action establishes the serial connections to the SER MGT ports on the server.
4. Continue with the installation by switching on the facility circuit breakers for
the first time.
See
"Switch On the Facility Circuit Breakers" on page
Related Information
"SP Cables" on page 60
"SP Network Addresses" on page 64
"Connect the SP Cables" on page 97

▼ Switch On the Facility Circuit Breakers

Caution – This procedure provides the safest and preferred way of supplying
facility power to the server by switching on the facility circuit breakers in sequential
order. If you do not have access to the circuit breakers and the facility power grids
are on, connect the power cord IEC 60309 plugs to the live facility power grid sockets
in the order of the AC input filters.
1. Confirm that you have properly installed and secured the server.
See
"Installing the Server" on page
145.
73.
Powering On the Server for the First Time
145

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents