Oracle sparc M5-32 Installation Manual page 114

Table of Contents

Advertisement

2. Route the left two SP cables connected to SP0 down and out of the server. Route
the cables over the lower door hinge and out the left side of the server.
When installed, the kick plate will secure these cables to the server. There are two
slots in the kick plate, one on the top left of the kick plate and one on the far left
edge, that enable the cables to exit the server.
The illustration shows how to route the left two SP cables of the server.
104
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents