2. Determine if you will be routing the power cords up through the top of the
server, or down through the floor.
3. Use a T20 Torx screwdriver to remove the three M4X10 screws securing the right
cable bracket.
Remove the right cable bracket from the server, and store the bracket and screws
in a safe location.
4. Determine if you will be routing the data cables up through the top of the
server or down through the floor.
124
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
If routing the power cords downward, leave the right cable bracket as is. Skip
to
Step
5.
If routing the power cords upward, remove the right cable bracket as described
in the following steps.
If routing the data cables upward, leave the left cable bracket as is and skip to
Step
8.
If routing the data cables downward, continue to the next step to reposition the
left cable bracket.