Review the server's cable management devices – see
■
Devices" on page
Stabilize the server to the installation site – see
■
page
87.
Confirm that the left cable bracket is installed in the upward position – see
■
"Prepare the Cable Routing Brackets" on page
2. Route the data cables up the server to the cable hooks located above the IOUs.
3. Lead the data cables to the left cable bracket and then up and out the top of the
server.
4. Using tie-wraps, secure the data cables to the cable partitions, cable hooks, and
and the left cable bracket.
122.
Connecting the Rear Power Cords and Data Cables
"Cable Management
"Stabilizing the Server" on
123.
137
Need help?