Oracle sparc M5-32 Installation Manual page 147

Table of Contents

Advertisement

Review the server's cable management devices – see
Devices" on page
Stabilize the server to the installation site – see
page
87.
Confirm that the left cable bracket is installed in the upward position – see
"Prepare the Cable Routing Brackets" on page
2. Route the data cables up the server to the cable hooks located above the IOUs.
3. Lead the data cables to the left cable bracket and then up and out the top of the
server.
4. Using tie-wraps, secure the data cables to the cable partitions, cable hooks, and
and the left cable bracket.
122.
Connecting the Rear Power Cords and Data Cables
"Cable Management
"Stabilizing the Server" on
123.
137

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents