Preparing the Site

Prepare to install the server at the installation site.
No.
Task
1
Review the high-level site preparation checklist and
installation site guidelines before you begin.
2
Confirm that the physical site is ready to receive the
server.
3
Ensure that the power requirements are met.
4
Understand the environmental requirements and
ensure that the cooling system can maintain the
server within the ideal operating range.
5
Plan how the server will get from the loading ramp
to the installation site.
6
Prepare the network server addresses and serial
connections.
Related Information
"Understanding the Server" on page 1
"Preparing for Installation" on page 67

Site Preparation Checklist

Before installing the server, ensure that the following requirements are satisfied.
Link
"Site Preparation Checklist" on page 19
"General Installation Site Guidelines" on page 22
"Reviewing the Physical Specifications" on page 23
"Reviewing the Power Requirements" on page 30
"Preparing for Cooling" on page 43
"Preparing the Unloading Route and Unpacking
Area" on page 53
"Planning Network Addresses" on page 59
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the sparc M5-32 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Sparc m6-32

Table of Contents