Preparing For Installation; Handling Precautions - Oracle sparc M5-32 Installation Manual

Table of Contents

Advertisement

Preparing for Installation

These topics detail the precautions to follow and the tools to assemble prior to
installing the server.
Description
Prevent equipment damage and personal
injury by understanding the server
handling cautions.
Prevent damage to components by taking
the ESD precautions.
Observe all of the Oracle safety and
security warnings.
Assemble all of the tools and equipment
required for the server installation.
Attach an antistatic wrist strap when
installing and cabling the server.
Related Information
"Preparing the Site" on page 19
"Installing the Server" on page 73

Handling Precautions

Caution – The server weighs approximately 3700 lbs (1678 kg) installed and
4015 lbs (1821 kg) in its shipping container. A minimum of four people are required
to move the server to the installation site. More people will be required to push the
server up ramps or over rough surfaces.
Link
"Handling Precautions" on page 67
"ESD Precautions" on page 68
"Oracle Safety Information" on page 69
"Equipment Needed for Installation" on page 69
"Attach an Antistatic Wrist Strap" on page 70
67

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the sparc M5-32 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Sparc m6-32

Table of Contents