Connecting Cables; Cabling Requirements - Oracle SPARC S7-2L Installation Manual

Hide thumbs Also See for SPARC S7-2L:
Table of Contents

Advertisement

Connecting Cables

These tasks describe how to connect cables before you attempt to boot the server.
Step
Description
1.
Review the cabling requirements.
2.
Review the front and rear panel connectors and ports.
3.
Connect the management and data cables.
4.
Secure the cables to the CMA.
Related Information
"Rear Panel Components (Installation)" on page 20
"Installing the Server" on page 33
"Powering On the Server for the First Time" on page 75

Cabling Requirements

Prior to cabling and powering on the server, gather this network information:
Links
"Cabling Requirements" on page 59
"Front Panel Components With Eight-Drive Backplane
(Installation)" on page 14
"Front Panel Components With Twelve-3.5-Inch-Drive Backplane
(Installation)" on page 15
"Front Panel Components With Twenty-Four-Drive Backplane
(Installation)" on page 17
"Front Panel Components With Twelve NVMe Drive Backplane
(Installation)" on page 19
"Rear Panel Components (Installation)" on page 20
"Identifying Ports" on page 60
"Connecting Data and Management Cables" on page 66
"Secure Cables to the CMA" on page 72
"Verify Operation of Slide Rails and CMA" on page 55
Connecting Cables
59

Advertisement

Table of Contents
loading

Table of Contents