Note – The power cords attach at the top of the server. Routing the power cords
through the bottom of the server uses 115 in. (2.92m) of the cord length, leaving only
4 ft 10 in. (1.48m) available to connect to the AC power receptacles. Therefore, when
routing power cords under the server, ensure that the power receptacles are within 4
ft. (1.22m) of the server.
Caution – The installation site must have a local power disconnect (for example,
circuit breakers) between the power source and the power cords. You will use this
local disconnect to supply or remove AC power from the server. See
Capacity Requirements" on page 43
Caution – Ensure that you install the server near your power grid's electrical
outlets, and ensure that these outlets are easily accessible in case you must detach the
power cords in an emergency.
Note – Electrical work and installations must comply with applicable local, state, or
national electrical codes. Your facility manager or a qualified electrician must connect
these power cords to the facility power grids.
Related Information
"Power Cord-to-Power Supply Relationship" on page 40
"Circuit Breaker Capacity Requirements" on page 43
"Connect the Power Cords" on page 126
Length
4.4m (14 ft, 5.25 in.)
4.4m (14 ft, 5.25 in.)
for more information.
Facility AC Outlet Plug
60A, 250V, 3-phase,
IEC 60309 IP67 (460P9W) 4-wire plug
32A, 380V / 415V, 3-phase,
IEC 60309 IP67 (532P6W) 5-wire plug