1. Confirm that you have completed the following:
Cut a hole in the floor to route the power cords and data cables. For
■
dimensions, see
Specifications" on page
Stabilized the server to the installation site – see
■
page
87.
Review the server cable management devices – see
■
Devices" on page
Confirm that the left cable bracket is installed – see
■
Brackets" on page
2. Route the data cables up the server to the cable hooks located above the IOUs.
3. Lead the data cables to the left cable bracket and then down the left cable
channel and down through the bottom of the server.
"Mounting Holes and Cable Routing Floor Cutout
28.
122.
123.
Connecting the Rear Power Cords and Data Cables
"Stabilizing the Server" on
"Cable Management
"Prepare the Cable Routing
139