Oracle sparc M5-32 Installation Manual page 176

Table of Contents

Advertisement

circuit breakers, 39
capacity, 43
local power disconnect, 35
switching off, 127
switching on, 145
time-to-trip requirements, 43
clearance, airflow requirements, 47
clock board
location, 7
CMU
described, 10
location, 9
components
front, 7
rear, 9
configuration parameters, Oracle Solaris OS, 156
configuring
Oracle Solaris OS, 156
cooling
ceiling vents, 49
perforated floor tiles, 50
requirements, 49
copper reactivity rate, 46
CPU memory unit
See CMU
crossing gaps using metal plate, 82
crossover adapters, RJ-45, 145
D
data cables
routing down, 138
routing up, 137
securing cables, 136 to 140
DCU
components, 10
described, 10
fully-populated, 12
half-populated, 12
depth
packaged, 54
unpackaged, 24
DHCP, Oracle ILOM, not supported, 64, 150
dimensions
caster, 26
floor cutout, 28
installation area, 25
leveling feet, 26
166
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
mounting bracket holes, 28
server, 24
shipping container, 54
domain configurable unit
See DCU
door
installing, 115
power cords, avoiding latch, 132
removing, 100
E
EMS
cabling, 134
location, 9
network addresses, 65
Enterprise Manager Ops Center, 17
environmental requirements, 44
ESD
grounding jacks, 5, 7, 9, 70
precautions, 68
wrist strap, 70
express module SAS
See EMS
F
facility power
center-point grounded, 39
powering on, 145
receptacle, 36
requirements, 37
fan module
location, 7
Fault LED, 4
features, 3
front LED panel
described, 4
location, 7
G
gaps, using metal plate to cross over, 82
gaseous and particulate guidelines, 46
grounding
ESD wrist strap jacks, 5
requirements, 42

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents