6. Continue to switch on each power grid circuit breaker in the order of the AC
input filters, and verify the operation of each power supply after switching on
each circuit breaker.
Confirm that the green OK LEDs on the appropriate power supplies are lit after
switching on each circuit breaker. Use the following table to determine which AC
input filter powers which power supplies. See
Relationship" on page 40
AC Input Filter
AC0
AC1
AC2
AC3
AC4
AC5
for more information.
Power Supplies
PS5, PS11
PS4, PS10
PS3, PS9
PS2, PS8
PS1, PS7
PS0, PS6
"Power Cord-to-Power Supply
Powering On the Server for the First Time
147