3. Use a 13-mm wrench to raise each leveling foot.
Turn the wrench counter-clockwise to raise the leveling feet up to the bottom of
the server.
4. After raising each leveling foot, use a 19-mm wrench to secure the 19-mm
locking nuts to the server.
Turn the wrench counter-clockwise to secure the locking nuts. When tightened,
these locking nuts prevent the leveling feet from being raised or lowered.