General Installation Site Guidelines - Oracle sparc M5-32 Installation Manual

Table of Contents

Advertisement

Requirement
Question
Have you set aside an area, away from the installation location, where you can safely
unpack the server?
See
"Unpacking Area" on page
Data
Do you clearly understand the data connections required for setting up the server
connections
and connecting it to the network?
See
"Planning Network Addresses" on page
Have you prepared network addresses for all data connections?
See:
"Mandatory Cable Connections and Network Addresses" on page 59
"SP Network Addresses" on page 64
"PDomain Cables and Network Addresses" on page 65
Related Information
"General Installation Site Guidelines" on page 22
"Preparing for Installation" on page 67

General Installation Site Guidelines

Follow these guidelines when selecting a location for the server.
Do not install the server in a location that is exposed to:
Use power outlets that provide proper grounding
Observe the precautions, warnings, and notes about handling that appear on
labels on the equipment
22
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
Direct sunlight
Excessive dust
Corrosive gases
Air with high salt concentrations
Frequent vibrations
Sources of strong radio frequency interference
Static electricity
A qualified electrical engineer must perform any grounding work
Verify the grounding method for the building
57.
59.
Check

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the sparc M5-32 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Sparc m6-32

Table of Contents