Oracle sparc M5-32 Installation Manual page 121

Table of Contents

Advertisement

5. Route the two right SP cables from SP1 down to the lower right corner of the
server and then up the right channel.
There are two slots on the top right of the kick plate that enable you to route the
cables down and then bend them up the channel secured by the right trim panel.
When installed, the kick plate and the right trim panel will secure the SP cables to
the server.
Note – Do not kink the cables when bending them up the right channel, and ensure
that the cables are on the right side of the screw stand-offs and the door latches.
Connecting the Front SP Cables
111

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents