2. Note problems or peculiarities at the site that require special equipment.
For example, ensure that the doors are tall enough and wide enough for the
server.
See
page 24
3. Install all necessary electrical equipment, and ensure that sufficient power is
provided for the server.
See
4. If you will be routing power cords or data cables down through the floor,
prepare a floor cutout for these cables.
See
for the floor cutout dimensions.
5. Ensure that the installation site provides adequate air conditioning.
See
information.
6. Prepare the entire route from the loading dock to the installation site.
See
7. Prepare a 3/16-inch (4.8-mm) thick A36 metal plate with beveled edges that is
large enough to support the server when it rolls over gaps or holes in the floor.
See
information.
8. If necessary, prepare a metal ramp to go up or down minor elevation changes.
See
9. Operate the air conditioning system for 48 hours to bring the room temperature
to the appropriate level.
10. Clean and vacuum the area thoroughly in preparation for installation.
Related Information
"Preparing the Site" on page 19
■
"Preparing for Installation" on page 67
■
74
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
"Shipping Container Dimensions" on page 54
for more information.
"Facility Power Requirements" on page
"Mounting Holes and Cable Routing Floor Cutout Specifications" on page 28
"Heat Dissipation and Airflow Requirements" on page 47
"Access Route Guidelines" on page
"Use a Metal Plate to Cross Gaps in the Floor" on page 82
"Move Server Up or Down a Ramp" on page 84
and
"Physical Dimensions" on
37.
55.
for more information.
for more
for more