Raise The Leveling Feet - Oracle sparc M5-32 Installation Manual

Table of Contents

Advertisement

Related Information
"Leveling Feet and Caster Dimensions" on page 26
"Install the Mounting Brackets" on page 91

▼ Raise the Leveling Feet

Before moving or repositioning the server, make sure that you raise all four leveling
feet.
Note – The leveling feet must remain securely down on the floor at the installation
site. Only raise the leveling feet before moving the server.
1. Open the server doors.
2. Use a 19-mm wrench to loosen the 19-mm locking nuts located at the top of each
leveling foot.
Turn the wrench clockwise to loosen the 19-mm locking nuts.
Installing the Server
89

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the sparc M5-32 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Sparc m6-32

Table of Contents