Unpacking Area - Oracle sparc M5-32 Installation Manual

Table of Contents

Advertisement

"Handling Precautions" on page 67
"Moving the Server" on page 78

Unpacking Area

Prior to unpacking the server from its shipping container, ensure that you have
provided enough space to unpack the server. Refer to the Unpacking Guide, which is
attached to the shipping carton, for the unpacking instructions.
Caution – You must provide 10 ft (3 m) as a stopping zone to slow and stop the
server after it rolls down the shipping pallet ramps. Failure to provide this stopping
zone could lead to equipment damage or serious physical injury.
Note – Remove the shipping container in a conditioned space away from the final
installation site to reduce airborne particles entering the data center.
Preparing the Site
57

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the sparc M5-32 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Sparc m6-32

Table of Contents