Oracle sparc M5-32 Installation Manual page 96

Table of Contents

Advertisement

6. After rolling up or down the ramp, remove the ramp and replace the server
doors.
For instructions on installing a door, see
Related Information
"Access Route Guidelines" on page 55
"Server Moves in Every Direction" on page 78
"Move the Server to the Installation Site" on page 79
"Use a Metal Plate to Cross Gaps in the Floor" on page 82
86
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
"Install the Door" on page
115.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m6-32

Table of Contents