Check Tpc And Ethernet Hub Connections To Power; Route Lamp Leads Up And Connect - Christie CP2000 User Manual

Hide thumbs Also See for CP2000:
Table of Contents

Advertisement

LIT MAN USR CP2000
020-100032-04 Rev. 1 (03/14)
Figure 2.8. Check TPC and Ethernet Hub Connections to Power
5-7) CONNECT LAMP LEADS (
At the igniter:
Figure 2.9. Route Lamp Leads Up and Connect
Make sure igniter door is open (Figure 2.5). From the ballast in the
pedestal, route the main black and white lamp leads through the
nearby hole in the underside of the projection head. See Figure 2.9.
Route the
lamp cooling compartment wall. See Figure 2.9.
Connect the
igniter terminal (¾" wrench). This terminal also has a small PCB
attached—stack this on top of the lamp lead. See Figure 2.9.
• Make sure the PCB directs to the back and remains at
least ¾" from the high-voltage terminal (with braid connection).
• Route all igniter wires AWAY from 9-pin and 15-pin connectors.
Close and lock the igniter door.
):
Figure 2.9
NEGATIVE (–) BLACK
lamp lead through the hole in the
POSITIVE (+) WHITE
lamp lead to the
WARNINGS
• Twist both ballast cables twice-per-foot
INSTALLATION AND SETUP
(CP2000 shown)
POSITIVE (+) WHITE
POSITIVE (+)
2-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents