INSTALLATION AND SETUP
2-10
To create this loop, connect the OUT/warm and IN/cool hoses as described below
(note: hose connections may not be labeled). Make sure to depress each hose connector
tab before inserting the hose end, then release to seal. This prevents damage caused by
forcing the gasket end into a closed connector. Listen for a "click".
The long loose
hose connected to
the reservoir is the
OUT/warm hose
from the projection
head—connect to
the projection head
location closest to
the non-operator's
side of the
projector.
The short loose
hose connected to
the heat
exchanger is the
IN/cool hose—
connect to the
projector head
location closest to
the operator's side
of the projector.
IMPORTANT: To prevent damage to the sealing gasket, always depress the
connector tab when inserting the hose end. Avoid "forcing" together, and listen for
"click".
7) Fill the reservoir completely (initial filling for hoses only)
After connecting the hoses, completely
fill the cooler reservoir with Christie's
50/50 mix of distilled water and ethylene
glycol.
For this first filling, simply fill the
reservoir completely—there is no need to
check the gauge. Virtually all of this first
supply of liquid will be drained into the
hoses upon initial power-up, at which
point the reservoir must be re-filled to the
correct level at the gauge window (see
2.5, Initial Power-up).
8) Check Lead Dressing & Hoses
At this point, integral pedestal-to-head
cabling and hose connection should be
complete. Check all lead dressing and
secure as neatly as possible to prevent
Figure 2.14. Connecting the Hoses
Figure 2.15. Fill Reservoir
LIT MAN USR CP2000
020-100032-04 Rev. 1 (03/14)