Toro Multi Pro 1200 Service Manual page 118

Hide thumbs Also See for Multi Pro 1200:
Table of Contents

Advertisement

4. Place diaphragm back disc and new diaphragm onto
each connecting rod. The connecting rods should ex-
tend above the diaphragms when correctly installed
(Fig. 14). Position nylon washer and washer on each
connecting rod and then thread hex bolt into connecting
rod. Torque bolt to 60 ft- -lb (81 N- -m).
5. Make sure that pump casings align and then secure
pump casing assembly by torquing five (5) bolts to 32 ft- -
lb (43 N- -m).
6. Secure diaphragm covers to pump with hex bolts (4
per cover). Torque bolts to 55 ft- -lb (75 N- -m).
7. Place new O--rings and valves into diaphragm cover
openings (Fig. 15). Inlet valves should be installed with
the spring down into the cover. Outlet valves should be
installed in with the spring up and away from cover.
8. Place valve chamber over valves noting orientation
of chamber inlet and outlet. Secure valve chamber with
two (2) hex bolts. Torque bolts 60 ft- -lb (81 N- -m).
Spray System
2
1. Diaphragm
1. Inlet (suction)
2. Inlet valve
Page 6 - - 18
Figure 14
2. Connecting rod
1
3
2
2
Figure 15
3. Outlet valve
Multi Pro 1200/1250
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi pro 1250

Table of Contents