Adjustments; Adjustments; Shift Cable Adjustment - Toro Multi Pro 1200 Service Manual

Hide thumbs Also See for Multi Pro 1200:
Table of Contents

Advertisement

Adjustments

Shift Cable Adjustment (Fig. 7)
1. Park machine on a level surface, stop engine, en-
gage parking brake and remove key from the ignition
switch. Place the shift lever in the neutral position.
2. Remove cotter pins and clevis pins that secure cable
clevis to shift levers.
3. Check that the threads of the shift cables are cen-
tered in the mounting brackets. If needed, readjust shift
cable jam nuts.
4. Adjust cable clevis with clevis jam nuts so that for-
ward and backward free play of clevis is equal relative
to the hole in the transaxle shift lever. Tighten clevis jam
nuts.
5. Secure cable clevis to shift levers with clevis pins and
cotter pins.
6. Check shift lever for proper operation.
Drive Train
1. Shift cable jam nut
2. Clevis pin
3. Clevis jam nut
Page 7 - - 10
2
2
3
3
1
5
Figure 7
4. Shift cable (1/reverse)
5. Shift cable (2/3)
Multi Pro 1200/1250
1
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi pro 1250

Table of Contents