Installing The Bbu; Required Tools; Preliminary Steps; Connecting The Bbu Cable To The Bbu - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

9.5.1

Installing the BBU

Upgrade and Repair Units (URU)
Average task duration: 15 minutes
V
CAUTION!
Do not connect the cable using excessive force, the connector is
weak.
Follow the safety instructions in chapter
page
43.
9.5.1.1

Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less
9.5.1.2

Preliminary steps

Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Disabling SVOM boot watchdog functionality" on page 76
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64
9.5.1.3

Connecting the BBU cable to the BBU

I
There are different BBUs available.
RX100 S7
Upgrade and Maintenance Manual
Expansion cards and backup units
"Important information" on
237

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents