9.5.1
Installing the BBU
Upgrade and Repair Units (URU)
Average task duration: 15 minutes
V
CAUTION!
Do not connect the cable using excessive force, the connector is
●
weak.
Follow the safety instructions in chapter
●
page
43.
9.5.1.1
Required tools
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
●
9.5.1.2
Preliminary steps
Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Disabling SVOM boot watchdog functionality" on page 76
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64
9.5.1.3
Connecting the BBU cable to the BBU
I
There are different BBUs available.
RX100 S7
Upgrade and Maintenance Manual
Expansion cards and backup units
"Important information" on
237