Concluding Steps - Fujitsu PRIMERGY RX100 S7 Upgrade And Maintenance Manual

Server
Hide thumbs Also See for PRIMERGY RX100 S7:
Table of Contents

Advertisement

Figure 68: Installing the 2.5-inch HDD/SSD module
Ê Carefully push the HDD/SSD module into the empty bay (1) until it stops.
Ê Push the handle completely (2) in the direction of the arrow until the locking
mechanism engages.
7.1.2.5

Concluding steps

Ê Perform the following procedures:
1.
"Closing the rack door" on page 73
2.
"Performing a RAID array rebuild" on page 95
RX100 S7
Upgrade and Maintenance Manual
Hard disk drives / solid state drives
149

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents