15.3.2.4 Concluding steps
Ê Perform the following procedures:
1.
"Installing the new system board" on page 380
2.
"Closing the server" on page 66
3.
"Installing the server in the rack" on page 68
4.
"Switching on the server" on page 72
5.
"Closing the rack door" on page 73
15.3.3 Replacing the TPM
Field Replaceable Units (FRU)
Average task duration: 30 minutes
V
CAUTION!
Advise your contact persons that they must provide you with TPM
backup copies. For security reasons, the TPM must be restored/re-
saved by the customer. After installing a new system board, the TPM
must be enabled. You may not clear the TPM data.
If the contact persons DO NOT have a backup copy available, inform
them that replacing the TPM board will cause to lose all data.
V
CAUTION!
Follow the safety instructions in chapter
page
43.
RX100 S7
Upgrade and Maintenance Manual
System board and components
"Important information" on
371