Ê Route the SGPIO line in the cable clamp (see circle).
Ê Thread the SGPIO line through the recess (see circle).
Ê Connect the RAID card cable to the RAID controller and install the RAID
controller as described in section
riser module 2" on page
16.1.6 Concluding steps
Ê Perform the following procedures:
1.
"Closing the server" on page 66
2.
"Installing the server in the rack" on page 68
3.
"Switching on the server" on page 72
4.
"Closing the rack door" on page 73
16.2
Replacing the front panel cable
Field Replaceable Units (FRU)
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.
16.2.1 Required tools
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
●
RX100 S7
"Installing an expansion card in
203.
Upgrade and Maintenance Manual
"Important information" on
Cables
389