Expansion cards and backup units
9.4.4
Removing an expansion card in riser module 2
Upgrade and Repair Units (URU)
Average task duration: 5 minutes
V
CAUTION!
Follow the safety instructions in chapter
page
43.
9.4.4.1
Required tools
Preliminary and concluding steps: tool-less
●
Main steps:
●
– slot 2: tool-less
– slot 1: Phillips PH2 / (+) No. 2 screw driver
9.4.4.2
Preliminary steps
Ê Perform the following procedures:
1.
"Opening the rack door" on page 59
2.
"Disabling BitLocker functionality" on page 75
3.
"Shutting down the server" on page 59
4.
"Extending/removing the server from the rack" on page 60
5.
"Opening the server" on page 64
212
Upgrade and Maintenance Manual
"Important information" on
RX100 S7